Why commercial kitchen projects need clash detection more than typical building spaces
Mike Perigard, Vice President of BIM Design
Building Information Modeling (BIM) clash detection identifies spatial conflicts in 3D models before construction begins, catching issues like floor drains intersecting structural beams or equipment utilities crossing mechanical systems. Through cloud-based platforms like BIM 360, ACC, Newforma and Navisworks, project teams can see combined architectural, structural, and foodservice models in real time, resolving conflicts when changes cost hundreds rather than thousands of dollars. The technology has evolved from an architectural tool to a coordination necessity that directly impacts construction budgets and timelines. After 33 years at Cini-Little and being involved with over 2,000 projects, I’ve watched BIM transform from a novelty into standard practice. When Revit first emerged around 2008, it was mainly an architectural tool designed to make it easier for architects to build walls, windows, and doors. The program didn’t even have a category for foodservice equipment. Everything was called “specialty equipment,” which also included elevators. If you turned off a microwave in the model, you turned off the elevators too.
Now we have dedicated foodservice equipment categories, and the coordination capabilities have fundamentally changed how we prevent construction problems.
Why Do Commercial Kitchens Create More Coordination Challenges?
Commercial kitchens pack more building systems into tighter spaces than almost any other facility type. A single kitchen contains cooking equipment requiring gas connections, exhaust hoods demanding dedicated ductwork, refrigeration systems needing electrical service, plumbing for sinks and floor drains, fire suppression integrated into ventilation, and specialized lighting.
Traditional 2D coordination struggles with this complexity. Everyone works sequentially, discovering conflicts only when drawings clash.
BIM flips this process. Through BIM 360, all the work models live in the cloud. We can be linked live to a Revit model, and we can see updates instantaneously. An owner can jump on the platform and see all of the combined models, including architectural, structural, and foodservice drawings in real time. They can look at everything in 3D views without having to download or install software.
For example, if we place a floor sink in a location where a structural beam runs through the same space, clash detection will flag the conflict so we can quickly identify and resolve these structural coordination issues. Catching that in the model is a matter of design-phase coordination time. Discovering it on-site is a different problem entirely, requiring structural modifications, replumbing, schedule delays, and resubmittals that compound quickly once construction is underway.
Key Takeaways:
- Commercial kitchens contain more building systems per square foot than typical spaces
- Traditional 2D coordination catches conflicts only after multiple disciplines complete drawings
- Real-time cloud collaboration shows all team members the same coordinated model
- Conflicts caught in models cost significantly less than field corrections
How Does 3D Visualization Help Beyond Finding Clashes?
The 3D aspect does more than identify conflicts. It helps clients understand designs in ways 2D drawings never could.
It’s sometimes challenging for clients or operators to follow 2D drawings on paper. 3D visualization helps people better understand how a chef or server will actually function within a space. Many struggle to interpret equipment like griddles, fryers, or workstations in 2D drawings, but renderings, walkthroughs, or navigating the model make the layout much clearer and more intuitive in terms of real-world use.
This catches operational problems that wouldn’t show up as clashes. A chef might look at a 3D walkthrough and realize the equipment placement on the cooking line disrupts the flow they need during service. Or an operator sees that the queue flow for customers doesn’t match their service model. These aren’t technical conflicts between building systems, but they’re expensive to fix after construction.
Models are becoming smarter too. Each piece of equipment might have different parameters associated with it that include the cost, the installation date, and information about when it should be serviced. Within five years, I’d see that being more involved for sure, where BIM models serve facility management long after construction completes.
Key Takeaways:
- 3D visualization reveals operational workflow issues invisible in 2D plans
- Virtual walkthroughs let operators test spaces before construction
- Smart models capture equipment data useful for facility operations
- Future models will integrate cost, scheduling, and maintenance information
What Should Architects Know About Working with BIM Consultants?
The evolution of manufacturer involvement has accelerated coordination quality. When we first started with Revit, creating equipment families was completely manual. Now many manufacturers provide Revit families with correct dimensions and technical specifications built in.
If the manufacturer provides the family, it’s going to be the correct size, it’s going to have the correct data associated with it. It makes it easier for us to coordinate accurately. However, as a company, we don’t spec just Revit family- ready equipment. If there’s another piece of equipment that’s right for the project, we’ll create the family ourselves and spec that equipment.
This distinction matters. Equipment should be selected because it’s best for the operation, not because someone already modeled it. If the right equipment doesn’t have a family available, experienced consultants build it.
Cloud collaboration through BIM 360 has been transformative. There are different ways architects structure their workflow. We can be linked live to a Revit model and see updates instantaneously, or some prefer to publish a model maybe weekly, so you grab it and work with a stable version while they make changes throughout the week.
Both approaches work when teams establish clear protocols. The key is ensuring that everybody has visibility into each other’s models. It’s used for clash detection, for communication, for posting updated PDF sets. What matters most is getting all disciplines publishing on the same cadence so coordination happens continuously rather than in disconnected bursts.
Key Takeaways:
- Many manufacturers now provide Revit families with embedded specifications
- Equipment selection should drive BIM content, not vice versa
- Cloud collaboration eliminates coordination lag from sequential 2D review
- Synchronized submission schedules across disciplines enable effective coordination
Preventing Problems Before They Start
The technology exists to prevent virtually every major construction conflict before breaking ground. Start coordination early. Conflicts identified during schematic design cost pennies to fix. The same issues discovered during construction cost thousands.
Establish clear submission schedules where all disciplines publish models on the same cadence. Trust the expertise on your team. Clash detection highlights spatial conflicts, but experienced consultants determine which matter most and how to resolve them practically.
After managing thousands of projects, 3D coordination has fundamentally improved how we deliver commercial kitchen designs. The projects that embrace this technology early and establish good protocols consistently deliver better outcomes.
Mike Perigard is Vice President of BIM Design at Cini-Little International with 33 years of experience and involved with over 2,000 projects across healthcare, hospitality, education, and commercial foodservice segments.
Ready to coordinate your next project effectively? Connect with Mike Perigard and the Cini-Little team at cinilittle.com